उत्पत्ति के प्लेस
Guangdong, China
Information to quote
samples or 2D.3D drawings.
Leadtime for mould
15--45days, on basis of the difficulty level
Service life
50 thousand shots or more
Cavity number of mold
depend on product size
Runner system
Hot runner , Cold runner
Surface treatment
Words corrosion, Mirror polish ,Frosted surface or textured surface
Product Name
Commodity plastic mold injection
Mould Cord
P20 steel, 718, 2738,H13, NAK80,2344,2343,S136,etc
Mould Base
KM, DME, HASCO, FUTABA