1.We pack it by film at first, then secure it inside the container by fixing to the container wall through steel wire.
2.One container can load 3 complete sets(we use rack to hold the upper sets).
3.Production leadtime is 15 days for 1 set, 20 days for 3 sets.
बंदरगाह
shenzhen
आपूर्ति की क्षमता
आपूर्ति की क्षमता
5 Set/Sets per Month चीन निर्माता के लिए PC200-5/PC200-6/PC200-7/PC200-8 18 m लंबी